Aluminum Bonding Fin Heat Sink for Thermoelectric

A thermoelectric module puts its waste on one small square face and expects the sink to take it from there - at a clamp load, in whatever air the instrument has. This bonded fin heat sink for thermoelectric modules is shaped for that: a thick base with a machined face for the TEC hot side, holes along the length for the clamp screws, and bonded fins on a wide pitch that still move heat when nothing is blowing.

The wide pitch is deliberate. TEC assemblies are usually fanless or lightly fanned, and a dense stack that a 40 mm fan cannot push through is worse than a sparse one that convects on its own.
Availability:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

aluminum bonding fin heat sink for thermoelectric-3

aluminum bonding fin heat sink for thermoelectric-2

aluminum bonding fin heat sink for thermoelectric-1

Construction and Materials

The base is machined from 6063 aluminum with a flat TEC face and drilled clamp holes, grooved on the fin side. Aluminum fins are cut, bonded with thermal epoxy and cured under load; the TEC face is fly-cut after bonding so clamp pressure lands evenly, and the part is cleaned and packed with the face protected.

Key Characteristics

Thick base for clamp load

Takes screw pressure without bowing.

Wide fin pitch

Convects with no fan or a small one.

Holes along the length

Clamp screws sit outside the TEC footprint.

Face cut after bonding

Even contact under the module.

Narrow footprint

Fits the instrument, not the bench.

Technical Specifications

Base Material Aluminum 6063 extruded base with bonded aluminum fins
Base Thickness 8-15 mm for clamp load
Fin Gap 5-12 mm (natural convection)
TEC Face Fly-cut flat, protected for shipping
Clamp Holes Drilled along the length per drawing
Base CNC Tolerance Milling / drilling / tapping down to +/-0.005 mm
Dimensional Inspection Hexagon CMM +/-0.001 mm; 2.5D optical projector
Quality System ISO 9001:2015; IATF 16949:2016
Capacity 60,000+ thermal parts per year
Lead Time Samples typically 7-15 days; production scheduled to volume

Note: values above are KingKa build options and verified capability; final geometry, holes and finish are confirmed against your drawing.

Process and Quality Control

Clamp load is the hidden spec: a base that bows under the screws lifts the module edge and adds contact resistance, which is why base thickness is set by stiffness and the face is cut after bonding.

Process flow

  • Design & CFD. 3D layout with CFD review sizes the fin field, pipe route and base thickness to the load and airflow.

  • Base machining. Plate, pockets and pipe channels are milled on 50+ CNC centers to +/-0.005 mm.

  • Fin and pipe joining. Fins skived, stacked or extruded; pipes pressed and soldered; the stack joined to the base by the process the design calls for.

  • Face fly-cutting. Contact face machined flat after joining so the part sits true on the device.

  • Final inspection. Hexagon CMM (+/-0.001 mm) and 2.5D projector check critical features; 4-stage IQC / IPQC / FQC.

What we verify on every batch

  • Fin pitch and height - measured against the drawing before packing.

  • Base flatness - fly-cut face checked on the contact side.

  • CMM report - critical dimensions to +/-0.001 mm.

  • Joint inspection - solder or weld fillet checked along the stack feet.

  • Visual and batch audit - IQC / IPQC / FQC on every run.

Application Scenarios

TEC hot-side sinks are specified by clamp load and air, not by wattage alone:

  • TEC cooling assemblies

  • Laser temperature control

  • Laboratory instruments

  • Portable coolers

  • Sensor cold stages

Customization and OEM Service

Send the TEC footprint, the module stack height, the clamp method and the ambient. KingKa sets base thickness for the clamp load and fin pitch for the air that is actually available.

Procurement Advantages

KingKa is a direct manufacturer with 16+ years in thermal production, 50+ CNC centers, in-house skiving, FSW and vacuum brazing, certified to ISO 9001:2015 and IATF 16949:2016.

Send the clamp method with the drawing - screws, spring clips and bars load the base differently, and the thickness that works for one is wrong for another.

  • One supplier for the whole assembly. Base, fins, pipes and hardware under one quality system.

  • CFD before tooling. Design review catches a bad layout before metal is cut.

  • Prototype to volume. Samples in 7-15 days, production scheduled to forecast.


Previous: 
Next: 
Get a Quote Now

PRODUCTS

QUICK LINKS

CONTACT US

   Tel: +86 13712444018 
   E-mail: sales2@kingkatech.com 
    Add: Da Long Add: New Village,Xie Gang Town, Dongguan City, Guangdong Province, China 523598
Leave a Message
Get a Quote Now
Kingka Tech Industrial Limited    All rights reserved     Technical Support: Molan Network