loading

Heatpipe welding zipper stacked fin heatsink

A stamped fin stack is only as good as the joint under it, and this heatpipe welding zipper stacked fin heatsink is built around that joint: the locked stack is welded or furnace-soldered to the base along every fin foot, and the heat pipes are joined through the fin field rather than pressed against it.

The difference shows up after cycling. A pressed or gap-filled contact starts to lift at the edges of the stack, and the sink that met its number on day one misses it a year later; a continuous metallurgical joint does not move.
Availability:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button
  • KINGKA

Construction and Materials

Aluminum sheet is punched and locked into a stack, the stack and base are fixtured and joined by furnace soldering or welding, heat pipes are inserted and joined through the fin field, and the mounting face is machined flat after the joint cools.

Key Characteristics

Locked zipper stack

Thin sheet fins locked tooth to tooth.

Continuous joint

Welded or furnace-soldered at every foot.

Pipes joined through the field

Not pressed against the stack.

Stable after cycling

Joint does not lift at the stack edges.

Face cut after joining

Flatness restored post-weld.

Technical Specifications

Base Material Aluminum zipper fins; copper or aluminum base; welded or furnace-soldered joint
Fin Zipper fins stamped and locked into a stack
Joint Welded or furnace-soldered to the base
Pipe Heat pipes joined through the fin field
Base Copper or aluminum
Fin Capability Fin thickness from 0.2 mm, height to 200 mm, gap 1.0 mm
Base CNC Tolerance Milling / drilling / tapping down to +/-0.005 mm
Dimensional Inspection Hexagon CMM +/-0.001 mm; 2.5D optical projector
Quality System ISO 9001:2015; IATF 16949:2016
Capacity 60,000+ thermal parts per year
Lead Time Samples typically 7-15 days; production scheduled to volume

Note: values above are KingKa build options and verified capability; final geometry, holes and finish are confirmed against your drawing.

Process and Quality Control

The joint is where a stacked sink fails, not the fin. Furnace soldering holds the base flatter; welding gives a stronger foot but pulls the plate, so the face is cut after the joint cools.

Process flow

  • Design & CFD. 3D layout with CFD review sizes the fin field, pipe route and base thickness to the load and airflow.

  • Base machining. Plate, pockets and pipe channels are milled on 50+ CNC centers to +/-0.005 mm.

  • Fin and pipe joining. Fins skived, stacked or extruded; pipes pressed and soldered; the stack joined to the base by the process the design calls for.

  • Face fly-cutting. Contact face machined flat after joining so the part sits true on the device.

  • Final inspection. Hexagon CMM (+/-0.001 mm) and 2.5D projector check critical features; 4-stage IQC / IPQC / FQC.

What we verify on every batch

  • Fin pitch and height - measured against the drawing before packing.

  • Base flatness - fly-cut face checked on the contact side.

  • CMM report - critical dimensions to +/-0.001 mm.

  • Joint inspection - solder or weld fillet checked along the stack feet.

  • Visual and batch audit - IQC / IPQC / FQC on every run.

Application Scenarios

Welded stacks are used where the joint has to hold:

  • High-power LED arrays

  • IGBT and TEC modules

  • Server add-in cards

  • Telecom power shelves

  • Industrial drives

Customization and OEM Service

Send the load, the footprint and the pipe count. KingKa sets the stack pitch first, then the joint process - furnace soldering for flatness, welding where the base is thick.

Procurement Advantages

KingKa is a direct manufacturer with 16+ years in thermal production, 50+ CNC centers, in-house skiving, FSW and vacuum brazing, certified to ISO 9001:2015 and IATF 16949:2016.

Ask about the joint before the fin height: two sinks with the same fins and different joints do not age the same way.

  • One supplier for the whole assembly. Base, fins, pipes and hardware under one quality system.

  • CFD before tooling. Design review catches a bad layout before metal is cut.

  • Prototype to volume. Samples in 7-15 days, production scheduled to forecast.


Previous: 
Next: 
Get a Quote Now

PRODUCTS

QUICK LINKS

CONTACT US

   Tel: +86 13712444018 
   E-mail: sales2@kingkatech.com 
    Add: Da Long Add: New Village,Xie Gang Town, Dongguan City, Guangdong Province, China 523598
Leave a Message
Get a Quote Now
Kingka Tech Industrial Limited    All rights reserved     Technical Support: Molan Network